The project involved the construction of a new car dealership over 7500m2 on a site with a high vertical drop. Two types of structures have been recommended for this building built over 3 levels. The front, where the sales area, administrative offices, training rooms, a lounge and meals for clients, consists of a steel frame. Garage mechanics, laundry area and storage of tires in the rear portion is made of a reinforced concrete structure. A big 'drive thrue' and a service area 'quicklub' specially equipped to carry three oil changes simultaneously complete installations.