EMS Engineering services was retained to perform major repairs to the parking of Tours Chapdelaine. This property consists of two towers housing thirteen floors each in which an underground parking of 75,000 square feet (three floors) was built.
The project involved demolishing and rebuilding a structural slab levels P1 and P2 in which a polyurethane membrane was installed. Slabs on grade levels P2 and P3 were also demolished and rebuilt. The structural slab supporting the deck was repaired and preserved, but a polyurethane membrane has also been set up to protect the concrete surface from the elements. Ventilation, electricity and drainage were repeated on three levels. A new pumping station was also built at the P3 level.