This project was mainly to replace the masonry veneer limestone facade of the main building, reseal and insulation of the outer shell and to the seismic standards walls of masonry block device. Tubular galvanized steel, fixed to the structure of existing reinforced concrete was added to attach the facing stone masonry as the peripheral walls of masonry block.