In 2008, EMS has been commissioned by the City of Quebec to prepare plans and specifications for a bridge about 120 meters above the St-Charles River. The triangulated random variable geometry and steel structure should faithfully reproduce the architectural concept developed by architects in harmony with the community and the environment. The project was abandoned by the City of Quebec when the plans and specifications were completed to 100%.